Top Tips to Understand Construction Loan Rules in NSW

A direct guide for Singleton builders on how NSW building rules shape your construction loan, your drawdowns and your cash flow.

Hero Image for Top Tips to Understand Construction Loan Rules in NSW

Your construction loan is shaped by building rules as much as by your lender. Understand both before you sign a contract and you will avoid cash flow surprises during the build.

In Singleton, as across NSW, construction loans are regulated through the general credit and prudential rules rather than a product-specific regime. Your builder's payments follow the Home Building Act 1989 (NSW). The two meet at every drawdown, so they need to line up.

What Rules Apply to a Construction Loan in NSW?

A construction loan is regulated through the general credit and prudential rules for lenders, while the payments it funds are controlled by NSW home building law.

ASIC's responsible lending expectations come from the National Consumer Credit Protection Act 2009 (Cth). APRA supervises banks and other authorised deposit-taking institutions. Lender terms such as the number of drawdowns, build time limits, inspection requirements and fees are set by each lender, so they differ from one loan to the next. That is why comparing lenders matters, and why talking to a broker about construction loan options is useful before you commit to a builder.

How Much Deposit Can a NSW Builder Ask For?

Under the Home Building Act 1989 (NSW), the maximum deposit a builder can ask for is 10 per cent of the contract price. Work over $20,000 needs a written contract that includes a progress payment schedule.

Where Home Building Compensation Scheme cover is required, which applies to contracts over $20,000, the builder cannot ask for a deposit or any other payment until the cover is in place and a certificate is given. Check for that certificate before any money moves. You also get a five clear business day cooling-off period on these contracts.

Progress Payment Schedules: How Payments Must Match the Work

In NSW, progress payments must match the work actually carried out. They can be fixed amounts or percentages after set stages, amounts claimed as work is done and costs are incurred, or a mix of both.

If a claim is based on costs incurred, it must be backed by documents. This protects you from paying ahead of the build. Each lender sets its own drawdown stages, and these may differ from the builder's payment schedule, so compare the two before you sign. A builder asking for money before the work is done is a red flag for you and for your lender.

Ready to get started?

Book a chat with a Finance & Mortgage Broker at Get Approved today.

When Do Repayments Start on a Construction Loan?

NSW Government guidance says that if you finance a project home, you must start mortgage repayments once the first progress payment is made and you begin to draw down on the loan. Your lender may have extra requirements for progress payments, so ask early.

Many construction loans are set up so you only pay interest on the amount drawn down during the build. That means your repayments rise as each stage is paid. Interest-only on the drawn balance is typically a build-phase arrangement, and principal and interest repayments are likely to apply after completion, so you need to budget for that higher figure too.

As an example, consider a Singleton couple building on land they already own. Their loan is $600,000 and they plan to draw it in five stages. They use the illustrative rate of 6.75% p.a. After the first draw of $60,000, interest is about $338 a month ($60,000 x 6.75% / 12). By the final stage, with the full $600,000 drawn, interest alone is about $3,375 a month. Once the build ends, principal and interest repayments would be about $3,890 a month on $600,000 over 30 years at 6.75%, so they budget for that figure and keep a buffer in case the build runs late. Actual rates depend on your lender and your deposit, so use our mortgage repayment calculator to test your own numbers.

Does Your Lender Test You at a Higher Rate?

Yes. Authorised deposit-taking institutions must assess your ability to repay at a rate at least 3.0 percentage points above the loan rate. APRA confirmed in May 2026 that this buffer remains in place.

Using the illustrative 6.75% p.a., that means a test rate of at least 9.75% p.a. Part of the lender's assessment is also how much you can borrow. Check your borrowing capacity before you lock in a design, because a plan that costs more than your capacity allows will stall at the application.

If your loan has an interest-only period, the lender must assess you over the shorter remaining term when principal and interest apply, not the full loan term. Bonus or overtime income is often discounted by at least 20 per cent, so do not count on it to stretch your borrowing.

Do the Debt-to-Income Limits Apply to a Build?

No. Finance for the construction of new dwellings is exempt from APRA's debt-to-income limit, which applies from 1 February 2026. The limit applies to a lender's overall portfolio, not to you as an individual borrower.

The exemption does not remove the serviceability test above. You still need to show you can afford the repayments.

Why a Build Is Valued Differently by Lenders

During a build, lenders count both the amount already drawn and the undrawn committed amount when working out the loan-to-valuation ratio. Interest and fees add to it as well.

Property value is appraised conservatively, so a valuation may land below what you hoped. Higher loan-to-valuation loans attract higher capital requirements for lenders. Depending on your deposit and lender, lenders mortgage insurance may apply. That adds a cost to the loan, so ask for it to be quantified before you proceed.

Grants and Concessions for Building a Home in NSW

The NSW First Home Owner Grant is $10,000 for eligible buyers. For vacant land with a comprehensive home building contract, the combined value of land, contract and any variations must not exceed $750,000.

If you need the grant for a first drawdown or progress payment, the application goes through the approved agent providing your finance. Otherwise you apply within 12 months of settlement or completed construction. For contracts signed on or after 1 July 2023, you must live in the home for at least 12 continuous months, starting within 12 months of construction or purchase. Eligible first home buyers purchasing vacant land under the First Home Buyers Assistance Scheme pay no transfer duty at $350,000 or less, and a reduced rate above that and below $450,000 (contracts exchanged from 1 July 2023). Our first home buyers page explains how these fit with the rest of your plan.

How Investors Are Treated When Building

For an investment build, interest on a separate construction loan can generally be claimed while the land is vacant, but interest on a land loan generally cannot. Speak to your accountant about your own situation, as outcomes depend on your circumstances.

Where one loan funds both land and construction, the interest has to be apportioned. If you are weighing a build as an investment, our investment loans team can talk through loan structure so your accountant has clean figures to work with.

Singleton Builders: Keep Inspections and Payments in Step

Building Commission NSW gives $250 to $500 as an indicative cost of each progress inspection by an external inspector. Budget for these, as they help confirm the work matches the payment being claimed.

Before you sign, ask your broker for the lender's drawdown stages and compare them with the builder's schedule. If the two do not match, you could be left covering a gap from your own savings. It is usually easier to align the lender's drawdown stages and the builder's schedule before signing than to fix a mismatch mid-build.

Get the contract and the loan lined up before the first sod is turned. Call one of our team or book an appointment at a time that works for you, and we will map your build from application to handover.

Frequently Asked Questions

What is the maximum deposit a builder can ask for in NSW?

Under the Home Building Act 1989 (NSW), the maximum deposit is 10 per cent of the contract price. Where Home Building Compensation Scheme cover is required, the builder cannot ask for it until the certificate is given.

When do repayments start on a construction loan?

NSW Government guidance says repayments on a project home loan start once the first progress payment is made and you begin to draw down. Check your lender for any special requirements.

Are construction loans exempt from APRA's debt-to-income limit?

Finance for the construction of new dwellings is exempt from the limit. Lenders must still assess whether you can afford the repayments, including at a buffer of at least 3 percentage points above the loan rate.

Do progress payments have to match the work done?

Yes. In NSW, progress payments must match the work actually carried out. Claims based on costs incurred need supporting documents.